Skip to main content

Contact with local authorities

Contact with local authorities

In the case of facilities in an external plant that is carried out in public spaces, it may be necessary for local authorities to send supervisory personnel, police forces or transit agents. For this reason, they must also be involved in the organization. If project inspections are required, they should be coordinated in a way that minimizes work interruptions.

Personnel in charge of supervision are responsible for safety in the workplace so they must have appropriate contact information, including public services such as police, fire, and ambulance service.

Daily meetings are recommended in the case of projects lasting several days to review the progress of each day. At these meetings, at least the construction site supervisor and a network user representative in charge of the project must be present.

While everything is in order, these meetings should not be very extensive. In the case of larger projects, workplaces must be guarded by night security personnel, who must have the contact information of the public services and the project manager, who will be available at all times, from Monday to Sundays.
Read more @ fiber splicing contractor jobs

Comments

Popular posts from this blog

One strand of optical fiber is about the diameter of a human hair

As the saying goes, one strand of optical fiber is about the diameter of a human hair.CORNING It’s an amazing idea. Now, copper wires—sometimes called “twisted pair” because they are made of pairs of strands of copper twisted around one another—also carry data and telephone signals to homes and farms in much of rural America. But because of the characteristics of copper as a transmission medium, signals that travel over copper doesn’t have the extraordinary frequency range that light signals do, are subject to interference from other signals, and in general, degrade very quickly over more than a short distance. That’s why if you have a copper-wire DSL (digital subscriber line) subscription, you have to be very close to the phone company’s “central office” to get a download signal into your house. A DSL house is connected to a copper wire, not a fiber-optic cable. fiber optic installer salary Not only can light travel over fiber for hundreds of miles with little attenuation (im

Journal of ISSN Industrial Engineering Systems

Fiber optic structureI (Source: Samuel, 1988)  Core  dan  cladding  temade of silica material, glass,  orPlastic ber bertin qualityggi and free water.  Core   has an index blarger scale of cladding (n1 > n2) to the limit critical, so  it's possiblekan  occurrence of  refractionin  total  (total  internal  reflection ).  Withthereby the light will  always bepropagate in the core  to the ends  of the fibers.  Coating   ( jacket ) worksas the core protector and   cladding of t     ekanan physical outside, made of very plastic material quality  (Zanger,  1991,  Thomas,  1995,  Samuel,1988).   Optical fibergenerally classified medoggy 3 types (Figure 4) (Samuel, 1988): 1. Multimode Step Index ,  with finger-jari core 25 – 60 µm, cladding 50 – 150 µm. 2. Multimode Graded Index ,  with fingers core 10 – 35 µm, cladding 50 – 80 µm. 3. Monomode Step index ,  jari-jaricore 1 -16 µm, cladding 10 – 100 µm.  input outputProfilerefractive indexn1n 2n1n 2n 2S 2 S 1S 3 (a). Multimode fiber

There are two methods that are used to measure the loss

There are two methods that are used to measure the loss by insertion with a light source and power meter, a "connection cable test", also called "single-end loss", according to the TIA FOTP-171 standard, and a "cable network test installed" or "loss of two ends", according to the TIA OFSTP-14 (multimode) and OFSTP-7 (single mode) standard. The difference between the two tests is that the single loss test end uses only a launch cable and tests only the connector attached to the launch cable plus the fiber and any other component in the cable. The single-end test is mainly used to test connection cables or short cables since you can test each connector individually. The two-end loss check uses a launch cable and a receive cable attached to the meter and measures the loss of the connectors at both ends of the cable under test. The single-end check is generally used in connection cables to be able to test the connectors at each end of an indi